Cherry Creek School District – Sky Vista Chiller Replacement
Images courtesy of Cherry Creek School District
Scope:
Replacing Sky Vista’s chiller required attention to the cooling equipment and the mechanical and electrical connections around it. The Cherry Creek School District Sky Vista Chiller Replacement scope addressed replacement of the existing chiller and the associated mechanical and electrical systems. Our team provided mechanical and electrical engineering for Cherry Creek School District, Sky Vista Chiller Replacement. Design priorities included equipment layout, capacity, maintenance access, controls, and connections to the existing utility infrastructure. Mechanical planning addressed pumping, distribution, and operation of the heating or cooling systems. Electrical planning addressed equipment loads, distribution capacity, and the sequence of service connections.
Year:
2021Location:
ColoradoServices:
Mechanical, Electrical

