Skip to the content
MultiPoint Engineeringlogo darklogo light
  • Who We Are
  • What We Do
  • Portfolio
  • Insights
  • Careers
  • Contact Us
MultiPoint Engineering
  • Who We Are
  • What We Do
  • Portfolio
  • Insights
  • Careers
  • Contact Us
HomeMission CriticalNorth Texas Tollway Authority Data Center Fire Protection Analysis

North Texas Tollway Authority Data Center Fire Protection Analysis

Images courtesy of Tom Fox / The Dallas Morning News

Scope:

Engineering emphasized fire protection appropriate to a continuously operating equipment and mission critical function, with attention to reliable detection and suppression system performance. Our team supported NTTA Data Center Fire Protection Analysis at 5910 Plano Pkwy Plano, TX 75093. The North Texas Tollway Authority operates the region’s toll road network, including the Dallas North Tollway and President George Bush Turnpike, and its data centers support toll collection, transaction processing and traffic operations that must remain continuously available.

Year:

2023

Location:

Plano, Texas

Services:

Mechanical, Electrical, Plumbing, Fire Protection, Technology, Security
Prev Project Next Project

Dallas–Fort Worth

Austin

Houston

Denver

©2026 MultiPoint Engineering, Inc. · Beyond Engineering

Instagram
LinkedIn
Newsletter