Lockheed Martin Space Systems – Global Positioning Facility (GPF) III
Images courtesy of Shaffer Baucom Engineering & Consulting (photo: Copyright LMSS)
Scope:
The Global Positioning Facility III remodeled a portion of an existing building on a secured aerospace campus into a classified high bay clean room. It includes a 30,000 square foot SCIF high bay, a thermal vacuum test chamber, an anechoic test chamber, control and server rooms, gowning rooms, process chilled water, and a liquid nitrogen tank farm. Our team provided mechanical, electrical, and fire protection engineering for the project.
Location:
Littleton, ColoradoCost:
$38,000,000Size:
95,000 sq. ft.Services:
Mechanical, Electrical, Fire Protection

