HomeScience & TechnologyAGC Biologics Steam Boiler System Study
AGC Biologics Steam Boiler System Study

AGC Biologics Steam Boiler System Study

Scope:

Equipment connections and plant operation guided the work at AGC Biologics Steam Boiler System Study. Our team provided mechanical and electrical engineering study for AGC Biologics Steam Boiler System Study. Design priorities included equipment layout, capacity, maintenance access, controls, and connections to the existing utility infrastructure. Mechanical planning addressed pumping, distribution, and operation of the heating or cooling systems. Electrical planning addressed equipment loads, distribution capacity, and the sequence of service connections.

Year:

2022

Location:

Colorado

Services:

Mechanical, Electrical