Storage Tek – Building 2-Cooling Tower Replacement
Representative Image
Scope:
The Storage Tek Building 2 Cooling Tower Replacement scope addressed cooling tower replacement and the associated mechanical and electrical systems. Our team provided mechanical and electrical engineering for Storage Tek, Building 2 Cooling Tower Replacement, serving StorageTek. Design priorities included equipment layout, capacity, maintenance access, controls, and connections to the existing utility infrastructure. Mechanical planning addressed pumping, distribution, and operation of the heating or cooling systems. Electrical planning addressed equipment loads, distribution capacity, and the sequence of service connections.
Location:
ColoradoServices:
Mechanical, Electrical