Dallas Fort Worth International Airport Terminal C High Gates
Images courtesy of Dallas Fort Worth International Airport and The Walsh Group
Scope:
Building beside an active terminal and ramp made modular construction a practical part of DFW’s Terminal C High Gates replacement. Our team provided mechanical and electrical engineering for the replacement of DFW International Airport’s Terminal C High Gates. The $160 million, approximately 80,000 square foot project created a two level terminal area with five gates beside an active terminal and ramp. The design required coordination with the modular building approach and the surrounding operating airport. Six prefabricated steel framed modules were built offsite and moved about a mile across the airfield over six overnight shutdowns in 2021, passing under the Skylink guideway with about 6 inches of clearance. Electric cabling routed through the module walls was connected to the low voltage system once the modules were set. Walsh describes the approach as a first for a U.S. airport, and DFW opened the gates in June 2022, about four months ahead of schedule.
Year:
2022Location:
DFW Airport, TexasCost:
$160,000,000Size:
80,000 sq. ft.Services:
Mechanical, ElectricalAwards:
2023 IDEAS2 Awards Merit Award | American Institute of Steel Construction (AISC) 2023 Illumination Award | Illuminating Engineering Society 2022 Airport/Transit Award of Merit | Engineering News Record (ENR), Texas & Louisiana 2022 Texas & Louisiana Best Projects Award of Merit (Airport/Transit) | Engineering News-Record

